Design report of geotechnical investigations for construction of the park of wind turbines at the location Kostolac
Investor: JP Elektroprivreda Serbia
Street: Carice Milice 2, Belgrade
Description: It was planned construction of 20 (twenty) wind turbines with transformer station in the wider locality of Kostolac. Locations of the planned wind generators are located at landfills (dumps) from surface mine Drmno and Klenovnik.