M-2 highway reconstruction project
Reconstruction project of the main road M-2 Berane – Rožaje – Spiljani. Measurement of deflections using a Benkelman beam and measurement of sliding resistance.
BEOGRAD | Dobropoljska 21 | +381112653222 | office@geomehanika.rs
NOVI SAD | Sentandrejski put 145a | +381216419034, +381216419002
Reconstruction project of the main road M-2 Berane – Rožaje – Spiljani. Measurement of deflections using a Benkelman beam and measurement of sliding resistance.
Based on the request of the Client, CARMEUSE RESEARCH, AND TECHNOLOGY, a laboratory for geomechanics and construction materials of our company, performed laboratory tests of soil stabilization using ViaCalco C30 stabilizer.
Based on the request of the Client, “WINDVISION WINDFARM A” AND “WINDVISION WINDFARM B”, laboratory for geomechanics and construction materials of our company…
During the heavy rains in May 2014, a landslide was triggered which severely damaged the Cultural Center and threatened the school building.
Reconstruction and modernization of the existing railway track and construction of the second track of the Belgrade-Nis railway, Stalac-Djunis section, Conceptual solution, IPA 2011-WBIF-Infrastructure Project – Serbia Transport WB8-SER-TRA-14, EuropeAid 131160/C/SER/MULTI /3C, August 2015
At the location of Prahovo port, field investigations were carried out for the purposes of designing a new vertical dock. The works were carried out from the shore and from the water.
In order to constantly improve our services, we are proud of a new machine in the field equipment. It is a device for measuring pavement structure deflections (FWD) from the Danish manufacturer Sweco Danmark A/S.
Performing geotechnical investigation works for the construction of apartments and outdoor swimming pools within the Fruska Terme tourist complex in Vrdnik.
Geotechnical exploratory drilling for the preparation of the PDR of METRO IN BELGRADE was successfully completed.
Regardless of the state of emergency and limited movement, thanks to the most modern field equipment and a professional team, our company managed to carry out all the planned works in a very short time.
Thanks to the successfully completed work within the project “Belgrade Waterfront”, our company is also this time