Sports center Zlatibor

For the purposes of building a sports-training center, the necessary geotechnical surveys were carried out. The construction of a complex that will have 15 open soccer fields is planned on the plots from the Tornik Hotel to the foot of Tornik.

Chocolate Factory in Novi Sad

or the purpose of building the largest chocolate factory in Serbia, field and laboratory field tests were carried out on the basis of which the Geotechnical report was prepared. The location of the facility is near the E-75 highway and the Danube-Tisa-Danube canal.

Construction of cargo dock

Investigations and tests were carried out according to the Project of Detailed Geotechnical Investigations. Exploratory drilling was carried out mechanically, using a rotary process with continuous coring in everything according to the EUROCODE – 7 standard.