Static load test of piles
For the purposes of construction of facilities within the Project EXPO exhibition 2027, in Surcin, our company performed a test static loading of the piles, which confirmed the results that were obtained by calculation.
BEOGRAD | Dobropoljska 21 | +381112653222 | office@geomehanika.rs
NOVI SAD | Sentandrejski put 145a | +381216419034, +381216419002
For the purposes of construction of facilities within the Project EXPO exhibition 2027, in Surcin, our company performed a test static loading of the piles, which confirmed the results that were obtained by calculation.
Geotechnical field driling of boreholes for the reconstruction of the railway – Kraljevo-Rudnica section.
The execution of geotechnical field works for the extension of the runway for take off and landing with accompanying taxiways, platform, hangar and other facilities at Rosulje Airport.
Reconstruction and modernization of the Niš-Dimitrovgrad railway line, section of the Sićevačka gorge.
For the construction of facilities and related contents within EXPO BELGRADE 2027, we were engaged in the purpose of conducting geotechnical research in the period from April to May 2023. Field drilling of over 50 boreholes was successfully carried out, as well as CPT testing at 52 test points.
For the purposes of building a sports-training center, the necessary geotechnical surveys were carried out. The construction of a complex that will have 15 open soccer fields is planned on the plots from the Tornik Hotel to the foot of Tornik.
For the purpose of building an aqua park on Zlatibor, geotechnical investigation works were carried out in the Zlatibor town part Gajevi, as well as laboratory tests of soil and rocks..
Cilj terenskih radova je utvrđivanje litološke građe terena, a laboratorijskim ispitivanjima i karakteristike zastupljenih sredina u tlu.
or the purpose of building the largest chocolate factory in Serbia, field and laboratory field tests were carried out on the basis of which the Geotechnical report was prepared. The location of the facility is near the E-75 highway and the Danube-Tisa-Danube canal.
Research works for the Project for the construction of the National Training Center for Basketball included 4 boreholes up to 10 m deep, 2 trial pits, engineering geological mapping of core, taking disturbed and undisturbed samples and determining the level of groundwater.