Part of the projects wich we have successfully realized:
No. |
CIVIL ENGINEERING – NAME |
USER / INVESTOR |
1. |
Design report of the geotechnical conditions for construction – PROJECT FOR CONSTRUCTION APPROVAL of the system of the sewage and waste water treatment in the oil refinery Novi Sad. |
„NIS“ JSC, Novi Sad |
2. |
Geotechnical design report for the development of preliminary and final project of the local road pipeline for water supply from the water tower, “Beli Bagrem” up to the reservoir “Kumane” (Konglavica) near the village Kumane |
Institute for water management „JAROSLAV ČERNI“ JSC |
3. |
Geotechnical design report – Rehabilitation of the part of channel Šećeranski from km 4 + 850 to km 5 + 050 |
PLC „VODE VOJVODINE“, Novi Sad |
4. |
Geotechnical design report for the development of the technical documentation of the main project for the construction of 110 kV cable line from TS 110/35 kV “Belgrade 6” to the 110/35 kV “Novi Beograd – Toplana” |
Business company for the distribution of electrical energy “Elektrodistribucija-Beograd” LLC |
5. |
Geotechnical design report for the development of technical documentation of Main project for the construction of 110 kV cable from the existing TS 220/110 kV “Belgrade 5” to the planned TS 110/10 kV “Belgrade 41″ (Block 32) and from TS 110/10 kV ” Belgrade 41 “(Block 32) to the existing TS 110/10 kV” Belgrade 40 “(Block 20) |
Business company for the distribution of electrical energy “Elektrodistribucija-Beograd” LLC |
6. |
Geomechanical design report – Improving the existing road network for service needs of the facilities within the wind farm “Alibunar 1″ and ” Alibunar 2″ Place: ATAR of the Seluš and Vladimirovac village |
„WINDVISION Windfarm A“LLC. „WINDVISION Windfarm B“ LLC. |
7. |
Geo-mechanical design report on geotechnical conditions of the design and construction of the road with ancillary facilities for the needs of technical documentation of the Main project of relocation of the state road M-22 Beograd – Ljig in the field of exploitation of surface mine of Kolubara lignite basin, Book 2, Design report of the Geology and geotechnical testing, research and analysis |
PD RB „KOLUBARA“ LLC. Lazarevac Civil |
8. |
Geo-mechanical design report of the suitability of material from the borrow pit for the construction of the state road M-22 Beograd – Ljig in the field of exploitation of surface mine Kolubara lignite basin section from km 252 + 031 to km 285 + 655 Book 3 Project of the borrow pit |
PD RB „KOLUBARA. LLC Lazarevac |
9. |
Geotechnical design report for the purpose of the preliminary project with a feasibility study and a main project with access road drainage for the road – railway bridge in Novi Sad – with general geotechnical conditions for the design and construction of the access roads from the direction of the Venizelis street, Marka Miljanova and Rejlković street towards the road – railway bridge in Novi Sad with the accompanying infrastructure |
„EURO GARDI GROUP“LLC. |
10. |
Feasibility study and preliminary project of reconstruction and modernization of the railway Subotica-Horgos border with Hungary, HUSRB / 1203/111/038 BOOK 4. GEOTEHNICAL DESIGN REPORT, BOOK 1. ROUTE |
‘’CeS.COWI’’ LLC. |
11. |
Design report of geotechnical conditions for the Preliminary project of the reconstruction and modernization of the railway Subotica – Horgos – border with Hungary. |
‘’CeS.COWI’’ LLC. |
12. |
Design report of the geotechnical conditions for the construction, reconstruction and adaptation of the Vatin border crossing |
„PRO-ING” LLC. |
13. |
Design report of the geotechnical conditions for the construction of roads and buildings on the ”RG-01-21 Tilva-Bela Crkva” gas pipeline route and The design report of the geotechnical conditions for the construction of a ”RG-01-21 Tilva-Bela Crkva” gas pipeline and the OKM HS DTD ”Banatska Palanka – Novi Bečej” channel intersection on the channel stationary km 11+050 near Grebenac |
“PROMONT GROUP” LLC. |
14. |
Geotechnical design report for the Preliminary project for the construction of a one track railway by-pass around Niš |
Ces.COWI LLC. |
15. |
Geotechnical design report for the reconstruction and modernization of the existing railway track and the construction of a second railway track of the Beograd-Niš railway, between Stalać-Djunis |
Ces.COWI LLC. |
16. |
Geotechnical investigation with geo-mechanical laboratory tests on soil samples for the purposes of the Preliminary project of the reconstruction of the drainage system within the embankment ballast in “Grabovičko polje” |
PLC “EPS”, Belgrade; Branch of HE Đerdap, Kladovo |
17. |
Geotechnical investigation with geo-mechanical laboratory tests on soil samples for the purposes of the preliminary project and feasibility study of the protection of Obrenovac from Kolubara river high water levels. |
Ministry of agriculture, forestry and water management Republic directorate for water, Belgrade |
18. |
Geotechnical investigation work for the construction of the New bridge on the Sava river, on the location of the Old bridge on the Sava river. |
“BELGRADE WATERFRONT” |
19. |
Geotechnical design report for the purposes of obtaining a construction permit for the reconstruction or replacement of four pedestrian bridges and three road bridges on the Cmica river in the urban part of Paraćin |
Institute of civil engineering “IG”LLC. Banja Luka |
20. |
Geological – geotechnical documentation for the purposes of composing a plan of detailed regulation for a part of the Velika Moštanica settlement along the street of Dobrivoja Jovanovića, municipality of Čukarica |
Nebojša Ivković, Dobrivoja Jovanovića 89K,Velika Moštanica |
21. |
Increased maintenance of state roads connected to the E80 highway – corridor X Niš to Dimitrovgrad. 2.1 rank IB state road section No.39: Sadikov Bunar-Blato 2.2 rank IIA state road section No.221: Pirot-Kitka 2.3 rank IIA state road section No.221: Manastir Sv.Ilija-Rsovci 2.5.2 rank IIA state road section No..221: Prtopopinske vodenice – Smilovci |
“KORIDORI SRBIJE” |
22. |
Geotechnical design report on pile bearing capacity in the test field of TE KOSTOLAC B3 |
CMEC – China Machinerz Engineering Corporation |
23. |
Design report of the geotechnical conditions for the purpose of main road reconstruction Šćepan polje – Plužine (Crna Gora) |
COWI A/S Denmark |
24. |
Geotechnical design report for the completion of the preliminary project for the by- pass of the Jadran – jonska section of the highway in Montenegro (section 1.1 Budva by – pass) |
MOTT MACDONALD ROMANIA SRL |
25. |
Geotechnical desgin report for the preliminary project of the E80 highway from Kosovo* (Merdare administrative pass ) to Niš ( „Merošina“ loop), Sector 2 (39+419-77+000) from the settlement of Pločnik to Merdare |
COWI A/S Denmark |