Engineering-geological mapping of the slope
As part of the railway reconstruction project, the section KRALJEVO-RUDNICA, our team successfully finished a detailed engineering-geological mapping of the slope on the entrance portal…
BEOGRAD | Dobropoljska 21 | +381112653222 | office@geomehanika.rs
NOVI SAD | Sentandrejski put 145a | +381216419034, +381216419002
As part of the railway reconstruction project, the section KRALJEVO-RUDNICA, our team successfully finished a detailed engineering-geological mapping of the slope on the entrance portal…
For the purposes of construction of facilities within the Project EXPO exhibition 2027, in Surcin, our company performed a test static loading of the piles,…
Geotechnical field driling of boreholes for the reconstruction of the railway – Kraljevo-Rudnica section.
The execution of geotechnical field works for the extension of the runway for take off and landing with accompanying taxiways, platform, hangar and other facilities…
Reconstruction and modernization of the Niš-Dimitrovgrad railway line, section of the Sićevačka gorge.
For the purposes of building a sports-training center, the necessary geotechnical surveys were carried out. The construction of a complex that will have 15 open…
For the purpose of building an aqua park on Zlatibor, geotechnical investigation works were carried out in the Zlatibor town part Gajevi, as well as…
Cilj terenskih radova je utvrđivanje litološke građe terena, a laboratorijskim ispitivanjima i karakteristike zastupljenih sredina u tlu.
or the purpose of building the largest chocolate factory in Serbia, field and laboratory field tests were carried out on the basis of which the…
Research works for the Project for the construction of the National Training Center for Basketball included 4 boreholes up to 10 m deep, 2 trial…
The investigation area is located in the Zlatibor town part Ruj. The geotechnical study is the basis for the construction project of future buildings. 2…
Investigations and tests were carried out according to the Project of Detailed Geotechnical Investigations. Exploratory drilling was carried out mechanically, using a rotary process with…
The research area is located on the banks of the Danube in the immediate vicinity of the city center of Belgrade. Field investigations included exploratory…
The investigation area is located within the complex of the Toyo Tire Serbia LLC factory in Indjija. The following investigations were carried out: 4 boreholes…
For the purposes of building one of the largest tire factories in Serbia, investigative works were carried out. The research was carried out on the…
Performing geotechnical investigation works for the reconstruction of the old railway depot “Lozionica”.
The drilling rig is mounted on a 4-wheel drive truck. This configuration provides exceptional maneuverability and allows access to even the most inaccessible locations.
Conducting field investigation works for the construction of the sewage system in the municipality of Palilula, in the area
Geotechnical investigation works were carried out in order to define the characteristics of the terrain in the area intended for the construction of one of…
In the subject area, geotechnical investigations and laboratory tests were carried out in order to define the conditions for the construction of a bypass railway…
The construction of an additional unit at the existing HPP Potpec is planned, 4 boreholes were drilled in order to determine the condition of the…
Reconstruction project of the main road M-2 Berane – Rožaje – Spiljani. Measurement of deflections using a Benkelman beam and measurement of sliding resistance.
Based on the request of the Client, CARMEUSE RESEARCH, AND TECHNOLOGY, a laboratory for geomechanics and construction materials of our company, performed laboratory tests of…
Based on the request of the Client, “WINDVISION WINDFARM A” AND “WINDVISION WINDFARM B”, laboratory for geomechanics and construction materials of our company…
During the heavy rains in May 2014, a landslide was triggered which severely damaged the Cultural Center and threatened the school building.
Reconstruction and modernization of the existing railway track and construction of the second track of the Belgrade-Nis railway, Stalac-Djunis section, Conceptual solution, IPA 2011-WBIF-Infrastructure Project…
At the location of Prahovo port, field investigations were carried out for the purposes of designing a new vertical dock. The works were carried out…
In order to constantly improve our services, we are proud of a new machine in the field equipment. It is a device for measuring pavement…
Performing geotechnical investigation works for the construction of apartments and outdoor swimming pools within the Fruska Terme tourist complex in Vrdnik.
Geotechnical exploratory drilling for the preparation of the PDR of METRO IN BELGRADE was successfully completed. Regardless of the state of emergency and limited movement,…
Thanks to the successfully completed work within the project “Belgrade Waterfront”, our company is also this time
As part of the “Belgrade Waterfront ” project, at microlocation Plot 12a, our company was hired for the purpose of performing static penetration tests with…
Feasibility study with the conceptual design of the reconstruction and modernization of the railway line Subotica-Horgos-border with Hungary HUSRB/1203/111/038, book 4. Geotechnical study, volume 1.…
The entire plant is divided into several units that are functionally connected to each other. Given that the foundations of the objects in question have…
Elaborate on geological-geotechnical investigations of the terrain for the purposes of creating the Conceptual and Main construction project of…
The construction of 20 (twenty) wind generators with substations is planned in the wider area of Kostolac.
Research for the future facility “IKEA – BELGRADE EAST” consisted of drilling boreholes, taking samples…
Geotechnical investigations for the needs of the Belgrade Waterfront project consisted of drilling boreholes…