Investigations of the terrain for the construction of the wind farm park
– Elaboration of the carried out geotechnical investigations of the terrain for the construction of the wind farm park in the Kostolca location
Investor: JP Elektroprivreda Srbije
Carice Milice 2, Belgrade
Description: The construction of 20 (twenty) wind generators with substations is planned in the wider area of Kostolac. The locations of the planned wind generators are located at the tailings dumps from the Drmno and Klenovnik surface mines.