Hydroelectric Power Plant Potpec
– Feasibility study with the conceptual design of the construction of an additional unit at HPP Potpec
Investor: JP ELEKTROPRIVREDA SRBIJE
Carice Milice Street 2, Belgrade
Description: The construction of an additional unit at the existing HPP Potpec is planned, 4 boreholes were drilled in order to determine the condition of the soil and define the conditions for the construction of the unit and accompanying facilities.