Construction of the Solar Power Plant
– within the production complex of the TOYO TIRE SERBIA factory
Investor: Toyo Tire Serbia doo
Opis: The investigation area is located within the complex of the Toyo Tire Serbia LLC factory in Indjija. The following investigations were carried out: 4 boreholes with hydraulic drilling rig Comacchio MC-T5, 3 static penetration tests with CPT static penetrometer Pagani TG 73-200. Laboratory tests of soil samples were performed in our accredited laboratory. Based on those results, the parameters needed for the formation of the geotechnical terrain model were obtained.
Location: Indjija – July 2022.